Shipping Days |
|
---|
?* Information on days to ship and prices
Starting from∗ : | 116.14 € |
---|---|
Min. Shipping Days : | 6 Days |
*Unit price with basic configuration
Brand |
---|
Product Series |
Starting from∗ |
Min. Shipping Days : |
Product Type |
Head (diameter)(mm) |
Head (length)(mm) |
Overall Length(mm) |
Head material |
Part |
Handle material |
Brand | TOMBO INDUSTRY |
---|---|
Product Series | |
Starting from∗ | 116.14 € *Unit price with basic configuration Volume Discount |
Min. Shipping Days : | 6 Days |
Product Type | Kakeya |
Head (diameter)(mm) | 135 |
Head (length)(mm) | 240 |
Overall Length(mm) | 900 |
Head material | Other |
Part | - |
Handle material | Oak |
Loading...