Shipping Days |
|
---|
?* Information on days to ship and prices
MIE TECHNO
Starting from∗ : | 392.24 € |
---|---|
Min. Shipping Days : | 7 Days |
*Unit price with basic configuration
MIE TECHNO
Starting from∗ : | 433.50 € |
---|---|
Special price | |
Min. Shipping Days : | 8 Days |
*Unit price with basic configuration
MIE TECHNO
Starting from∗ : | 128.14 € |
---|---|
Special price | |
Min. Shipping Days : | 10 Days |
*Unit price with basic configuration
Brand |
---|
Product Series |
Starting from∗ |
Min. Shipping Days : |
Type |
Fitting Shape |
Multipoint Piping - Branch Pipe Connection Type |
Material |
Surface Treatment |
Nominal Dia. |
Nominal Dia. (2nd Fitting) |
Main Conduit Nominal |
Branch Pipe Nominal |
|
| ||
Brand | MIE TECHNO | MIE TECHNO | MIE TECHNO |
Product Series | Stainless Steel, Butt-Welded Type Pipe Fitting, 90° Elbow [Long] | Stainless Steel, Butt Weld Type Tube Fitting, 90° Elbow, [Short] | |
Starting from∗ | 392.24 € *Unit price with basic configuration Volume Discount | 433.50 € Special price *Unit price with basic configuration Promotional pricing ends 31/12/2024Volume Discount | 128.14 € Special price *Unit price with basic configuration Promotional pricing ends 31/12/2024Volume Discount |
Min. Shipping Days : | 7 Days | 8 Days | 10 Days |
Type | Butt Welding Type | Butt Welding Type | Butt Welding Type |
Fitting Shape | Elbows | Elbows | Others |
Multipoint Piping - Branch Pipe Connection Type | - | - | - |
Material | Stainless Steel | Stainless Steel | Stainless Steel |
Surface Treatment | - | - | - |
Nominal Dia. | 10B(250A) | 10B(250A) | 10B(250A) |
Nominal Dia. (2nd Fitting) | - | - | - |
Main Conduit Nominal | - | - | - |
Branch Pipe Nominal | - | - | - |
Loading...