GOSHO (GM)【1-500 Pieces Per Package】 (SPHGM-ST-W3/8)

GOSHO (GM) SPHGM-ST-W3/8
  • Promotional pricing
  • Volume Discount

Product Details:

Manufacturer part number: SPHGM-ST-W3/8

Brand: GOSHO WORKS

Price: 0.74

Delivery time: Same day


Technical Data:

Nominal of Thread (R): 3/8

Length: 10 mm

Material: [Steel] Carbon steel for construction

Surface Treatment: -

Number of Thread ridge: 19


Part Number

Once your search is narrowed to one product,
the corresponding part number is displayed here.

SPHGM-ST-W3/8

 

Part Number
SPHGM-ST-W3/8
Part Number
Standard Unit Price
Minimum order quantityVolume Discount
Standard
Shipping Days
?
RoHSNominal of Thread (R) Length
(mm)
Material Surface Treatment Number of Thread ridge Thread Part Dry Seal Sales Unit

0.74 €

0.41 €

1 Available Same day

Stock

103/810[Steel] Carbon steel for construction-19NALow Quantity (can be purchased from one)

Loading...

  1. 1

Basic information

Shape Standard Mounting Hole Shape Hex Socket Plug Type Sunk Head Plug

This page is GOSHO (GM), part number SPHGM-ST-W3/8.
You can find the detail information about specifications and dimensions on part number SPHGM-ST-W3/8.

Variation of this product

Part Number
SPHGM-ST-W1/16
SPHGM-ST-W1/2
SPHGM-ST-W1/4
SPHGM-STC-W1
SPHGM-STC-W1-1/2
SPHGM-STC-W1-1/4
Part NumberStandard Unit PriceNumber of pc(s). included in pkg.Minimum order quantityVolume DiscountStandard
Shipping Days
?
RoHSNominal of Thread (R) Length
(mm)
Material Surface Treatment Number of Thread ridge Thread Part Dry Seal Sales Unit

0.67 €

1 Available 6 Days 101/166[Steel] Carbon steel for construction-28NALow Quantity (can be purchased from one)

0.90 €

1 Available Same day

Stock

101/212[Steel] Carbon steel for construction-14NALow Quantity (can be purchased from one)

0.60 €

1 Available Same day

Stock

101/48.9[Steel] Carbon steel for construction-19NALow Quantity (can be purchased from one)

157.90 €

50 Pieces Per Package

1 pack 15 Days -116.5[Steel] Carbon steel for construction[Chromate] Chromate Plating11NABox/Package

517.17 €

25 Pieces Per Package

1 pack 15 Days -1 1/220[Steel] Carbon steel for construction[Chromate] Chromate Plating11NABox/Package

298.42 €

25 Pieces Per Package

1 pack 15 Days -1 1/419[Steel] Carbon steel for construction[Chromate] Chromate Plating11NABox/Package

Tech Support